Margaret Avenue Corridor

Margaret Avenue Corridor 

                                                    X-section.JPG

 

                                                        roadway.JPG

 

Project Description

The Margaret Avenue Corridor Plan was completed in August of 2007, and is currently being utilized to develop the plans for the corridor from SR 63 to SR 46. The Margaret Avenue Corridor Plan can be viewed at the link below. 

Click Here for Margaret Avenue Corridor Plan - (large pdf 32.3 mb)

At this time, the City of Terre Haute is acquiring the right of way to widen Margaret from US 41 to 7th Street. Plans are available in the Engineering Department. Scheduled construction start date for this segment is April of 2009. This segment includes a 5-lane cross-section with sidewalks on both sides and a tree row on the south. This segment is funded by a Federal Earmar

There are two other segments still in the early stages of design at this time. Those segments are from Fruitridge to 46 and from 7th Street to Canal Road. A general layout can be seen in the Margaret Avenue Corridor Plan.

                       
 